ADVANTAGES:
---IMPORTED SKF BEARINGS;
---IMPORTED ROTATING JOINT;
---ADOPT DYNAMIC BALANCE TO THE PULLEY, IT CAN WORK MUCH MORE STABLE;
---SPRAY TWO TIMES ANTI-RUST PAINTS, SO IT WON'T RUST ALL THE TIME;
---316L STAINLESS ROLLER ETC HIGH QUALITY MATERIALS;
---BUILD IT STRICTLY ACCORDING TO THE ORIGINAL KNELSON CONCENTRATOR'S PRINCIPLE......
Ghana 200t/h Alluvial Gold Ore Project, which is invested by Australia client, they buy complete set washing plant from us, after this project, they place another 100t/h alluvial gold plant to us, total amount is more than $360,000.
1. High concentrating ratio and high recovery
2. Total process automation, steady recovery performance
3. Center dischange design for fast, secure concentrate removal
4. Environmentally friendly(requires no chemical additives or reagents)
5. Low water and electricity requirements
6. Low production costs, durable wear parts, minimal maintennance requirements
7. Compact design requiring less space, easy merged into the existing mining processing
8. Quick payback on investment, typically lass than half year
Application shows
That the recovery can be as high as 99%, and the concentrating ratio is up to 1, 000 times. In recovering the natural gold in lode ore with size -0.074mm, the gold is up to 98%, For 0.04mm in particle size, the gold recovery is 97%.
Rovide high quality, best service and competitive price mining plants with flowchart and design diagram. Such as shaking table, jig, gold trommel, gold sluice, rotary screen, sand washer, spiral chutes, screening equipment, stone crusher, rock crusher, impact crushers, sand cleaning machine, belt conveyor, vibration screen etc which passed ISO9001: 2008 Certification.
Laos 100t/h alluvial gold ore project with GT1848 trommel screen and STLB80 gold centrifuge from us, get 98% gold recovery ratio.
We can make a special mineral processing approach for you with least cost & simplest way. We also provide all small/lab testing mining equipment, welcome to contact me for the details. Please do not hesitate to contact for possible business co-operation on below E-mail.
Gold Ore with clay need to use rotary scrubber for washing
Model |
STLB20 |
STLB30 |
STLB60 |
STLB80 |
Capacity (T/h) |
0-0.6 |
2-3 |
8-12 |
40-45 |
Fluidization Water Required (m3/h) |
2-3 |
3-5 |
7-10 |
30-36 |
Slurry Water Required (m3/h) |
1.5-4 |
5-7 |
8-12 |
40-45 |
Feeding Density (%) |
0-50 |
0-50 |
0-50 |
0-50 |
Feeding Size (mm) |
0-3 |
0-3 |
0-5 |
0-5 |
Concentration Cleaning Up Cycle |
Vein gold 1-3 Hours Placer gold:2-6 Hours |
Concentrate Weight (Kg) |
2 |
3-5 |
10-20 |
40-50 |
Power Requirements (Kw) |
0.75 |
1.5 |
4 |
11 |
Weight (Kg) |
205 |
380 |
1100 |
2300 |
Dimensions (mm) |
914×700×900 |
1160×885×1165 |
1820×1450×1700 |
2520*1900*2020 |
Alluvial placer gold sand ore washing plant, is for gold ore without clay